-
Completed boxes
- last edit: 23-Oct-2003
- comments: 0
-
Down draft table
- last edit: 23-Oct-2003
- comments: 0
-
Snap-loc flooring
- last edit: 23-Oct-2003
- comments: 0
-
Box tops
- last edit: 25-Oct-2003
- comments: 0
-
Work surface
- last edit: 25-Oct-2003
- comments: 0
-
Glued down
- last edit: 25-Oct-2003
- comments: 0
-
Finished box tops.
- last edit: 27-Oct-2003
- comments: 0
-
Start of tilt out shelf
- last edit: 29-Oct-2003
- comments: 0
-
Layout of shelf
- last edit: 29-Oct-2003
- comments: 0
-
Completed tilt storage shelf
- last edit: 01-Nov-2003
- comments: 0
-
Shelf fit in place
- last edit: 01-Nov-2003
- comments: 0
-
Miter saw mounted
- last edit: 02-Nov-2003
- comments: 0
-
Locating pins
- last edit: 02-Nov-2003
- comments: 0
-
Saw end of completed (phase one) UTS
- last edit: 08-Nov-2003
- comments: 0
-
Opposite end
- last edit: 08-Nov-2003
- comments: 0
-
Small box extended
- last edit: 08-Nov-2003
- comments: 0
-
Big end box extended
- last edit: 08-Nov-2003
- comments: 0
-
Dust box parts
- last edit: 24-Jan-2004
- comments: 0
-
45 Dust box mount
- last edit: 02-Feb-2004
- comments: 0
-
46 Dust box installed
- last edit: 02-Feb-2004
- comments: 0
Album Description:
Continuation of the building of my UTS
Album Info:
Album Stats:
- Photos: 20
- Views: 53,747
- Downloads: 28


1 comment
Larry, Things seem to have slowed down. Are you letting work get in the way. Bob
said
bhubbard36526 2003.10.30 at 14:47:28 PST
To be able to leave a comment please Log in or Sign up.