• Main Entrance. Before
  • Entrance under construction
  • Entrance and front yard. Before
  •  Entrance new concret under B/U, Installed new gas meters
  • Entrance after curbside work
  • Front yard Before
  • Front yard Patio After
  • Abused front yard with full of weeds. Before
  • Front yard another view Before
  • Front yard patio After
  • Front new patio layout
  • Old electric meter systems in basement
  • Upgraded and updated meters relocated at exterior wall
  • New located at North exterior wall
  • All upgraded to 300A wow
  • Side walkway along with marble stone and mulch covering
  • Unit high efficient heating systems - new installed
  • Unit 1A Old kitchen
  • Unit 1A relocated updated kitchen
  • Unit 1A New bedroom, the previous kitchen area
  • Unit 1A Sagged floor at widow side in master bedroom
  • Unit 1A The sagged floor joists out of rhe supporting wall
  • After Jacking up, supported by Lally columns
  • Unit 1A Lifted and leveled hardwood floor
1 2 next