• Some speaker & elec wiring
  • Ceiling Insulation -- Packed full to 3 layers; roof vents on alternate joists
  • Fireplace framing -- Along with Cody, Brandon & Slater
  • River wall header -- To be loaded up
  • NW Corner windows & fireplace
  • The Last Old Wall-To-Go -- Between the new LR and kitchen
  • Drywalling -- Brad working & Cody being Cody
  • The Last Wall -- Removal & alcove
  • Elec & Security wiring on South wall
  • Mud Hackers Pat & Tim -- Great work deserves credit
  • Mud Hackers 2 --Pat & Tim's work keeps getting better
  • Hackers 2b close-up
  • Mud Hackers 3 -- Do you believe I actually paid for this crap?
  • Hackers 3b close-up
  • Mud Hackers 5 -- This is after their final sanding!
  • dcp_0522
  • dcp_0523
  • dcp_0524
1