In-Law Suite Addition
dalawrence101 > albums
-
Front/side of house before start
- last edit: 23-May-2006
- comments: 0
-
Side view of house before start.
- last edit: 23-May-2006
- comments: 0
-
Trees taken down
- last edit: 23-May-2006
- comments: 0
-
Trees taken down
- last edit: 23-May-2006
- comments: 0
-
L-39 used to dig 12" x 24" footings with twin 5/8" reba...
- last edit: 23-May-2006
- comments: 0
-
Footings & basement dug. 32" x 12" lally column footing...
- last edit: 23-May-2006
- comments: 0
-
12" x 24" Footings dug, step footing & dam in place twi...
- last edit: 23-May-2006
- comments: 0
-
12" x 24" footings w/ twin 5/8" rebar in trenches.
- last edit: 23-May-2006
- comments: 0
-
L-39 used to dig footings & basement.
- last edit: 23-May-2006
- comments: 0
-
Footings poured. Block loaded into basement
- last edit: 25-May-2006
- comments: 0
-
Laying 12" block
- last edit: 25-May-2006
- comments: 0
-
12" CMU blockwork going up
- last edit: 31-May-2006
- comments: 0
-
12" CMU blockwork in progress
- last edit: 31-May-2006
- comments: 0
-
Laying 12" Concrete Block
- last edit: 31-May-2006
- comments: 0
-
Installing 4" foundation drain next to Concrete footing...
- last edit: 31-May-2006
- comments: 0
-
Addition full basement. Scaffolding & Block set up.
- last edit: 31-May-2006
- comments: 0
-
L-39 Kubota loading 3/4" gravel into basement.
- last edit: 31-May-2006
- comments: 0
-
12" CMU Block walls in progress. Begin damproofing & ba...
- last edit: 01-Jun-2006
- comments: 0
-
12" CMU blockwork in progress. Begin parging, damproofi...
- last edit: 01-Jun-2006
- comments: 3
-
Back of 12" CMU block foundation finished. Parging & da...
- last edit: 01-Jun-2006
- comments: 0
-
12" CMU Block completed. Scratchcoat applied. Backfill ...
- last edit: 08-Jun-2006
- comments: 0
-
12" CMU Block completed. Scratch coat applied. Basement...
- last edit: 08-Jun-2006
- comments: 0
-
Subfloor installed
- last edit: 14-Jun-2006
- comments: 0
-
Subfloor framing installed
- last edit: 14-Jun-2006
- comments: 0
-
Steel Drop Girders installed in 12" CMU basement walls
- last edit: 14-Jun-2006
- comments: 2
-
2"x6" wall framing & wall sheathing. Kubota L-39 with p...
- last edit: 20-Jun-2006
- comments: 0
-
2" x 6" wall framing & wall sheathing. Kubota L-39 with...
- last edit: 20-Jun-2006
- comments: 0
-
2" x 6" wall framing & sheathing.
- last edit: 20-Jun-2006
- comments: 0
Album Description:
In Law suite addition
Album Info:
Album Stats:
- Photos: 40
- Views: 34,519
- Downloads: 1


No comments so far...