• Ready for excavation
  • more footers
  • DSCN2619
  • LOoking towards the Corlew's
  • DSCN2616
  • DSCN2617
  • ready for inspection
  • Ready to pour
  • foooters and steel
  • pouring concrete
  • Concrete and pump
  • Installing block
  • More block
  • block work complete
  • getting ready to frame floor
  • Floor framing materials
  • Front view 2/07/05
  • garage side with Rusty
  • fireplace side plywood and walls
  • rear master window combination
  • Getting ready for roof framing
  • Front view
  • DSCN2698
  • master bedroom
1 2 next