• The foundation is complete
  • The start of the flooring
  • Working on the floor of the 2nd floor
  • Here they are framing the second floor
  • The start of the gable roof
  • Heres a picture from inside the attic
  • Here they are building the front gable
  • Danny!
  • Here they are digging the foundation of the house
  • The digging is complete
  • These are the forms for the footings. Our mason was A. Pigna and Son Mason Contractors
  • The footings are poured
  • They are starting to setup the forms for the poured concrete foundation
  • Pouring the foundation
  • The back corner of 2120
1 2 3 next