• Wellsbrook Entrance
  • cement at the front door
  • front porch done - other angle
  • Front porch done
  • siding almost complete
  • back yard cleared
  • back yard cleared for septic
  • 225 Tile on back wall done
  • 224 TILE in the kitchen
  • Kitchen tile complete
  • 2nd story porch to finish
  • Siding ALMOST done
  • Front porch ceiling done
  • High window in place
  • Deck begun
  • Back of house with window and deck
  • 235 Siding DONE
  • 236 Front view - no porch rail
  • 237 Corner view
  • 238 Shirley's porch sided - needs rail
  • Floor sanding
  • Corner sander - hall closet
  • Fill dirt for driveway
  • Fill dirt for driveway
1 2 3 4 5 next